POWER INFRASTRUCTURE EVALUATION
Project
Client
Country
Project-Period
A102: Electrification of 30 Riverine Communities at Escravos
Nigerian National Petroleum Corporation (NNPC)
Nigeria
2012 - Present
Purpose:
Build Power Plant on western side of the estuary, constructed sub-sea power transmission to eastern bank of estuary. Construct switch-yard and distribution lines to the communities.
Technical data:
150MW Single Cycle Gas Turbine, 2km sub-sea Transmission Cable, 100km of distribution of lines
SeWa Services:
- Surveying
- Conceptual Design
- Cost analysis