Home SeWa West Africa Ltd

POWER INFRASTRUCTURE EVALUATION

Project

Client

Country

Project-Period

A102: Electrification of 30 Riverine Communities at Escravos

Nigerian National Petroleum Corporation (NNPC)

Nigeria

2012 - Present

Purpose:

Build Power Plant on western side of the estuary, constructed sub-sea power transmission to eastern bank of estuary. Construct switch-yard and distribution lines to the communities.

Technical data:

150MW Single Cycle Gas Turbine, 2km sub-sea Transmission Cable, 100km of distribution of lines

SeWa Services:

  • Surveying
  • Conceptual Design
  • Cost analysis