POWER PLANT FEASIBILITY STUDY

Project

Client

Country

Project-Period

A059: Coal to Power (C2P) Enugu Axis

Federal Ministry of Power and Federal Ministry of Mines & Steel Development

Nigeria

2011 - Present

Purpose:

To produce stable, reliable and efficient power supply by developing the coal reserves within the state of Enugu, Nigeria.

Technical data:

Lot 1 Enugu Axis consisting of 4 Coal Blocks totalling estimated reserves of 150 million tonnes bituminous coal and three Thermal Power Plants designed to 1000MW and connected to the national grid.

SeWa Services:

  • Technical Investigation
  • Preparation of Contract Documents and Specifications
  • Seismic Survey, Cost Benefit & Time Analysis
  • Coal Mining & Power Plant Economics
  • Coal Mine Assessment and Power Plant O&M Analysis
  • Coal Power Plant Basic Design
  • Cost Estimates
  • Bankable Feasibility Report
  • Environment Impact Assessment
  • Project Management and Supervision of Third Party Contractors
  • Training and Capacity Building

PDF Format