CAPTIVE POWER PLANT FEASIBILITY STUDY
Project
Client
Country
Project-Period
A087: Captive Power Plant in Ashaka Cem, Gombe State
Ashaka Cement PLC, Ashaka, Gombe State, Nigeria & Lafarge of France
Nigeria
September 2013 - May 2014
Purpose:
Preparation of a Feasibility Study that includes (but is not limited to) data collection, Pre-FEED, economic estimates (CAPEX, OPEX), security and HSE review and organization, establishment of acceptable and compliant emission limits for the pollutants in the air, water and soil, etc., permitting requirements.
Technical data:
Phase "A": 2 x 16MWnet
Phase "B": Phase "A" + 2 x 16MWnet = 4 x 16MWnet
SeWa Services:
- Propose Technical Solutions and power units' sizing
- Pre-FEED
- Detail permit requirements for power generation and power evacuation
- Estimate Investment costs
- Estimate Operation & Maintenance costs (5-years look-ahead)
- Assess reliability and interruption risks
- Estimate project implementation time schedule
- Review and propose organization for Health and Safety
- Review and propose security organization