CAPTIVE POWER PLANT FEASIBILITY STUDY

Project

Client

Country

Project-Period

A087: Captive Power Plant in Ashaka Cem, Gombe State

Ashaka Cement PLC, Ashaka, Gombe State, Nigeria & Lafarge of France

Nigeria

September 2013 - May 2014

Purpose:

Preparation of a Feasibility Study that includes (but is not limited to) data collection, Pre-FEED, economic estimates (CAPEX, OPEX), security and HSE review and organization, establishment of acceptable and compliant emission limits for the pollutants in the air, water and soil, etc., permitting requirements.

Technical data:

Phase "A": 2 x 16MWnet

Phase "B": Phase "A" + 2 x 16MWnet = 4 x 16MWnet

SeWa Services:

  • Propose Technical Solutions and power units' sizing
  • Pre-FEED
  • Detail permit requirements for power generation and power evacuation
  • Estimate Investment costs
  • Estimate Operation & Maintenance costs (5-years look-ahead)
  • Assess reliability and interruption risks
  • Estimate project implementation time schedule
  • Review and propose organization for Health and Safety
  • Review and propose security organization